High School Flooded Gymnasium
When this high school’s gymnasium was devasted by water damage, CSNH was asked to rebuild the 14,000 square foot gym, workout room and theater in less than two months. Making it even more challenging was the discovery that there were several rooms built over the gym floor that needed to be suspended, and the entire area needed to be contained because school was in session. We did it though! Students were back in the newly rebuilt gym in less than two months.